Dec. 26th, 2012
I am not a complete failure at home improvement. I was able to actually successfully remove old baseboards, cut up/rip out old carpet and padding, cut boards (not such a fan of the big scary table saw, but felt comfortable pretty quickly on the lil jigsaw) and lay them. Hubby worked hard and bascially made what would have been a 10 day job for me into a 3 day job for the two of us.
Locking, floating hardwood floor is DONE (well, except for transitions at carpet and trim on walls) and it looks BEAUTIFUL.
And that, friends, is what I did on my Christmas vacation.
Locking, floating hardwood floor is DONE (well, except for transitions at carpet and trim on walls) and it looks BEAUTIFUL.
And that, friends, is what I did on my Christmas vacation.